Slide Rail Systems - 3 & 4-Sided Pit Gallery
Back to Project Gallery
Click on the project name or image to view more:
Willow Hill, PA
12x20x8 Slide Rail Pit for a foundation of an overhead easy pass located on the PA turnpike.Eldred, PA
16x24x32 Slide Rail to install a wet well to pump from the old treatment plant to the new plant that is a 1/4 mile away.Sewaren, NJ
20x20x24 Slide Rail Pit being used for a sewer main upgrade to a larger pipe and manholes.Manchester, NJ
A 16x16x20 Slide Rail pit gets installed for a wet well in a new townhouse development.PA
14'x14'x16-20' deep 4-sided Slide Rail System to support an existing electric pole foundation while a retaining wall is being constructed.Longwood Gardens, PA
A 14x37x16 Slide Rail pit with walers is installed for the new restaurant grease trap.Rockville, MD
A 26x87x14-16 deep Slide Rail System with walers is needed to install precast underground storm water retention pond for future apartment complex.Philadelphia, PA
A 12x16x12 Slide Rail Pit is installed for a fuel tank replacement at an elementary school.Valley Forge Tpk, PA
12x12x20 Slide Rail Pit gets installed for a manhole on the PA Turnpike in Valley Forge. New bridges over 422 and widening.Metuchen, NJ
A 20x24x32 Slide Rail pit gets installed for work to install a wet well for a future WWTP.Myerstown PA
14x14x16' deep 4-sided Slide Rail system used to first remove contaminated soils from the space to prepare for new vaults. Then boring under the road connecting to another newly installed tank and leap frogging this equipment to accomplish the job.Glassboro, NJ
A 16x16x20 4-sided Slide Rail pit gets installed so that a new residential phase can tie into an existing sewer main.New Brunswick, NJ
A 10x20x12 Slide Rail Pit gets installed for future wires and fiber optics running through the area.Phoenixville, PA
16x20x28 Slide Rail was needed to install a connection manhole onto an existing 42" pipe at a sewer treatment plant for upgrades.Reinholds, PA
A 14x16x20 Slide Rail pit is needed to install a wet well to pump 200 yards to a new sewer treatment plant.Woodlyn, PA
Slide rail systems being used to install bridge abutment and pier for an off ramp on the Blue Route.West Chester, PA
12x16x16 Slide Rail was used to put an inline silt separator in an existing 4' storm drain pipe main.East Orange, NJ
10x20x12 Slide Rail was used to install concrete vaults and then trench boxes was needed to connect them in a concrete duct bank. This is so they can run high power electrical lines through the town underground instead of towers overhead.Fairless Hills, PA
16x26x16 Slide Rail pit is used to install a wet well and a manhole. This is for the industrial park by the landfill.Egg Harbor, NJ
10' long x 10' wide x 16' deep 4-sided Slide Rail system with sheeting for pipe tie-in.Blue Bell, PA
8x24 Slide Rail retaining walls being used to replace and waterproof culverts crossing Rte 202Schuylkill Haven, PA
Using a 4-side Slide Rail Pit for a project to replace a fuel tank between the car wash island and convenience store. Steel sheets were also provided to assist with any undermining of the adjacent tanks.Lakewood, NJ
Project replacing an existing 12" sewer main with a 15". A one day deal to do the work in the intersection to accommodate the local residents.Lakewood, NJ
A 16x24x16 Slide Rail was installed for a 11x18 foundation with a 7' deep pool in a basement.Poconos, PA
Using Slide Rail to protect workers while they replace failed wing walls on a culvert on route 507 by Lake Wallenpaupack. They will install two more systems to finish.Northeast Philadelphia, PA
A 16x16x20 Slide Rail pit is needed to install a wet well. It is for storm water drainage at a new Top Golf location.Malvern, PA
12x12x16 3-sided Slide Rail System and steel trench boxes being used to install a valve on an eighteen inch gas line. Sheets will be used at both ends which will be slide rail.White Plains, NY
Opening up the road to connect a 15 story apartment building to the sewer main. Slide Rail was used with guide frame sheeting to shore around the existing utilities.Millville, NJ
A 16x41x8 Slide Rail system being used to remove contaminate soils. They will leap frog the bays to cover 210' of ground.Cheltenham, PA
8x24x24 feet deep for a bore pit. They are putting in an 16 inch casing for a gas main.Gwynedd, PA
16x20x16 ft, 3-sided slide rail being used next to route 202 in Gwynedd, PA to install a concrete vault for a storm drain retention pond.Milton, DE
Slide rail being used to prevent undermining of surrounding buildings to remove contaminated soil. They are using a 14x16x12 system to do four different overlapping pits.Paulsboro, NJ
Upgrading the underground plumbing between the refinery and the motor oil facility using slide rail. 24x42x8-16 feet deep.Philadelphia, PA
Using slide rail to shore a small area to finish waterproofing. 8' x 12' x 8'-10' deep with a slope on one side.Haworth, NJ
24x41x12 deep pit being used for soil remediation and new tank installation for a small gas station.Conshohocken, PA
Chestnut Hill Septa Station, bridge abutment for Allens Lane - slide rail panels used instead of wood. It increases their span and uses less i-beams.S Hampton, NJ
Hill Top using a 10x16x8 deep slide rail with parallel bars on one side for easy pipe work. They are replacing the sewer pumps that pump to their own septic system.Edison, NJ
20x20x20 4-sided pit for replacing an old 30" pipe and manhole. This is Edison's sewer pump station.Alexandria, VA
Trenchtech suggested building 2-12?L x 12?W pits side by side. The shoring was delivered, installed, forms and rebar built, concrete poured, backfilled, & returned in 9 daysChester County, PA
Installing a waste water pump station and then removing the small treatment plant at Garnet Valley H.S.Maris Grove, PA
Three sided slide rail being used so they can install a footer and some reinforced concrete piers. They are for the third story suspended bridge between two living center buildings. 18 X 18 X 16 deepPhiladelphia, PA - I-95
Single-tier 4-sided slide rail system for GR4 I-95 project (Mix of 20x20x8 and 24x24x8). Steel framed mats are sitting on 6x6 timbers outside of slide rail systems in order to drill piles.Fort Dix, NJ
45x45x12 deep system with 4-way posts to create cells for a remediation project. 2-bays will be leap-frogged to accommodate another contaminated area.Philadelphia, PA
A 3-sided slide rail used for new bridge pier footer pilings next to an existing footer.Newport News, VA
Slide rail to remove the manhole and put it back in 4' deeper at an existing 7 Eleven.Philadelphia, PA
For a pump station, they are going 24' deep to replace the manhole and set a well point.Ripping out the old storm drain and replacing it with new around existing utilities.
Slide Rail Systems - 3 & 4-Sided Pit applicationCleveland, OH
Slide rail for a pre cast elevator shaft between two commuter lines next to three freight lines.Back to Project Gallery